 |
July 11th
Step 1: Building the shed |
 |
July 16th
Building the shed, part 2 |
 |
July 19th
Removing the old garage |
 |
August 4th
Preparing the foundation area |
 |
August 7th
Digging the footings |
 |
August 9th
Pouring the footings |
 |
August 16th
Preparing for block work |
 |
August 17th
Laying the blocks |
 |
August 21st
Rearranging existing bathroom |
 |
August 24th
Laying the first floor |
 |
August 25th
Preparing for the second floor |
 |
August 26th
Decking and walls on the 1st floor |
 |
August 31st
Laying the second floor |
 |
September 2nd
Decking the second floor |
 |
September 7th
Decking the second floor, part 2 |
 |
Sept. 9th
Raising the roof, part 1
(8.7 MB zip file) |
 |
Sept. 14th
Raising the roof, part 2
(2.9 MB zip file) |
 |
Sept. 21st
Roofing, part 1
(4.5 MB zip file) |
 |
Sept. 23rd
Roofing, part 2
(4.3 MB zip file) |
 |
Sept. 28th
Roofing, part 3
(1.9 MB zip file) |
 |
Sept. 30th
Roofing, part 4 / Siding, part 1
(2.8 MB zip file) |
|
October 2nd
Siding, Part 2
(0.8 MB zip file) |
 |
October 4th
Windows
(1.2 MB zip file) |
 |
October 7th
HVAC and a bit of demolition
(3.9 MB zip file) |
 |
October 9th
Building the upstairs rooms
(1.9 MB zip file) |
 |
October 12th
Insulation and shingles
(4.5 MB zip file) |
 |
October 14th
Insulation and dormers
(2.5 MB zip file) |
 |
October 19th
Siding and dormers
(2.9 MB zip file) |
 |
October 21st
Sheetrock part 1!
(1.7 MB zip file) |
 |
October 26th
Stairs and Sheetrock part 2
(3 MB zip file) |
 |
October 28th
Siding and Sheetrock part 3
(1.7 MB zip file) |
 |
November 16th
Sheetrock
(1.6 MB zip file) |
 |
November 18th
Sheetrock, siding & cleanup
(3.3 MB zip file) |